Cameron Prairie National Wildlife Refuge Marsh Creation

DDG, as a subconsultant to Providence Engineering, assisted Venture Global in the permitting and design of 130 acres of marsh which is to be created as a means of mitigation for a new natural gas terminal and pipeline system in Cameron Parish. Excavated material from the site of the new terminal and pipeline system will be hydraulically dredged and transported approximately seven miles to the marsh creation site. Earthen containment dikes will be designed to keep dredged material in place while dredging activities are on-going. Coordination with local, state, and federal agencies is on-going and will continue throughout the construction of the project.

Project Details

Location
Cameron, LA
Client
Venture Global Calcasieu Pass, LLC
Services
Coastal Engineering
Scale
130 Acres of Marsh
Back to all Projects